Wednesday, January 6, 2010

Jan 6, 2010

Happy New year everyone! I finally posted collages showing work done September through January 5th (well a couple were before them; Dave and Our House collage photos). If you want to see the collages larger just click on them and you can see each photo in the collage larger. If you want to be emailed every time I enter a new blog entry (usually with current needs but also photos and current status), let me know and I will add you to list of those who are emailed the new blog when I enter it.

Blessings,

Cheryl







Wednesday, December 30, 2009

working on updated photos

Things have been so busy and there has been so much progress! We are continually blessed by story after story of God working in His mighty ways. I will be working on updating the website with all the new, wonderful supporters, as well as the blog with new pictures as soon as possible.

Blessings,

Cheryl

Thursday, December 24, 2009

Merry Christmas! :)

Merry Christmas everyone!!!! We hope you have a blessed day celebratiing the joyous birth of Christ, spending time with family.

David, Cheryl and Faith

Tuesday, December 22, 2009

Finishing up the first floor! Tilers needed!!

Great news; the floors are finished on the first floor, the kitchen is fully functional and we are working on moving to the first floor two rooms until the second story is finished. The floors are beautiful! We are so grateful to King Flooring for their work. We have our couch and table and chairs on the first floor and are ready for visitors this Christmas.

Anyone with experience installing tile would be tremendously appreciated. We need the small mudroom tiled to protect the new hardwood floors since it is the only room on the first floor, besides the bathroom, that is not hardwood floor and is where we will take our shoes off. After the mudroom we have three bathrooms on the second story that need tiling so anyone willing to help will be greatly appreciated!

Merry Christmas everyone!

Blessings,
Cheryl

Thursday, November 19, 2009

Current Needs--November 19

Current Needs:
People who can help us even if just for a few hours:
· Painters
· Carpenter
· Plumber
· Mason

· Someone to help fix our driveway and provide more parking spaces

Almost all the drywall is done. Currently we are working on sanding and priming the drywall, to be ready for painting. We could use help painting after November 21, 2009.

Plumber—The plumber has so much work to do and works Saturdays only so anybody who is a plumber and wants to come be a part of a blessed project and work with a fun, great christian man, come join us Saturdays or any time you have, during the week. We need to be hooked up to the new water line from the street, cap off our well water for outdoor use only and then hook up all the faucets and toilets.
Mason-- We need of a mason to fix the brick where windows were installed and the bricks had to be cut.
We also have a need for a window installer to retro fit a new window in an existing bath where there is tile. It is the last window needing to be installed.
Carpenter—We have two landings with roofs and a front porch portico to install, plus deck rails to complete a screened in porch. We will need help installing the hardwood floor towards the end as well.

We are all working every Saturday and guys are usually here during the week. Just give us a call or email me at bengaline@comcast.net , 301-528-8505 to let me know